Sunday, July 29, 2007

The final gap

All the framework and track bases have now been built down the left hand side of the garden. Track is being laid on the new boards.

The remaining gap across the bottom wall will be bridged with a 3.6m long truss bridge. Then we'll be able to run all the way round!