Today was S&T day, when the General Manager ensures that all the winter detritus is cleared out of the points in expectation of a running day, while simultaneously treading on as many lineside signals as possible.
It also provided an opportunity to test how well the 6 wheel wagon currently under construction fared on the track. R3 reverse curves are fine, R1 reverse curves, to no-one's surprise, aren't.